Fixed Price or Time and Materials for a Software Project?

Choosing between fixed price and time and materials (T&M) decides who carries the risk in a software project and how flexible the scope can be. What follows covers how each model works, strengths and weaknesses, hybrid approaches, managing scope changes and which projects suit which model.

Updated:

What is the fixed price model?

In a fixed price model, scope, timeline and total price are agreed in writing before work starts. The team commits to delivering the agreed scope for the agreed price; if the work takes longer, the extra cost as a rule stays with the team. Payments are often tied to milestones: when a part is delivered and accepted, the related amount is paid.

For this to work, the scope must be detailed. The more clearly screens, user roles, integrations, supported platforms and acceptance criteria are written, the more solid the price. Every vague item either turns into a risk margin in the proposal or into a dispute in the middle of the project.

Changes are possible under fixed price but follow a separate process. When you want to add or change a feature, its effect on time and price is calculated and approved in writing.

What is the time and materials model?

In a time and materials model, you pay for the effort spent and for any tools or services used. The team works for a period, hours or days are reported, and invoices follow. Scope is not frozen at the start; priorities are set with you as the project moves.

This model usually runs in short cycles. At the start of each cycle the work is chosen, at the end a working piece is shown, and the next step is planned from that result. What you learn about the product goes straight into the plan.

A variant is the dedicated team: specific people work only on your project for a long period, priced on the team's monthly cost. It suits products with a long and changing roadmap.

What are the pros and risks of each model?

Neither model is good or bad; each puts different risks on different sides. Compare them on these points:

The hidden cost of fixed price is often the risk margin, as the team prices in uncertainty. The hidden cost of time and materials is management effort: someone on your side needs time for prioritization, meetings and reports.

  • Budget predictability: Fixed price sets the total up front; time and materials relies on estimates controlled by a cap.
  • Flexibility: Under fixed price each change needs approval; under time and materials priorities can shift from cycle to cycle.
  • Preparation: Fixed price needs a detailed scope document; time and materials can start with less preparation.
  • Involvement: Fixed price needs less regular input from you; time and materials needs frequent product decisions.

How do hybrid models work?

Many projects use a mix. A common approach is a discovery phase: a short, separately priced piece of work that clarifies requirements, screen flows and technical architecture. Its output is a firmer scope and proposal for the next stage.

Another route is building the first version (MVP) at a fixed price and continuing later work on time and materials. You start with a known budget and move flexibly once user feedback arrives.

Time and materials can also have a cap: the team warns you as spend nears an agreed amount, and you decide together whether to continue. Whatever the mix, limits and approval steps should be written into the contract.

How are scope changes managed?

Scope changes in every software project at some point; what matters is agreeing up front how changes are handled. Under fixed price this happens through a change request process. Under time and materials, changes hit the budget directly, so prioritization is your call.

A sound change process has these basic steps:

  • The change is described in writing, with the reason it is needed.
  • The team calculates its effect on time and price and reports it in writing.
  • The change enters the plan only after your approval.
  • Approved changes are added to the scope document and timeline.

Which model suits which project?

The deciding factor is how clearly you know what you want to build. A rough split helps:

If you are unsure, a discovery phase is a good start: it reduces uncertainty and lets you choose the model based on evidence. For cost drivers and what a good proposal contains, see the guide to getting an app built.

  • Clear scope, short timeline, low chance of change: Fixed price usually fits better.
  • Unvalidated ideas shaped by user feedback: Time and materials fits better.
  • Long running, constantly evolving products: A dedicated team or time and materials stands out.
  • Fixed budget but unclear scope: Consider a discovery phase followed by staged pricing.

How should the payment plan follow the model?

In fixed price projects, payments are usually tied to milestones. For each milestone, the contract states what is delivered and how it is accepted; the amount is paid after acceptance. An upfront payment at the start is also common, and its share is settled when the contract is negotiated.

Under time and materials, invoices are usually periodic, for example monthly. Asking for a report showing how much time went into which work, alongside each invoice, is the easiest way to track the budget. With a dedicated team, the monthly fee depends on the team's makeup, and how staff changes will be communicated is agreed in advance.

Whichever model you choose, put the payment schedule next to the delivery schedule. Keeping payments neither far ahead of nor far behind the work balances the risk for both sides.

How does Techmora set the price for custom software?

In Techmora's custom software service, Techmora is your single contact and the party to your contract. The process starts with your needs; then a written proposal covers scope, timeline and budget, development moves forward with regular demos, and support follows delivery. The budget is set by scope, and code rights are written into the contract.

The pricing model is agreed for each project after the brief is reviewed. You can send a short brief describing your project through the contact form.

Checklist before choosing a pricing model

  1. The project's goal and target user are written in a sentence or two.
  2. Features needed in the first version are listed.
  3. Features that can wait are separated.
  4. Supported platforms and integrations are defined.
  5. You have honestly assessed how clear the scope is.
  6. A total budget range and a cap are set.
  7. Acceptance criteria and a definition of delivery are written.
  8. A change request process is in the contract.
  9. Payments are tied to milestones or to periods.
  10. Reporting and demo frequency are agreed.
  11. Rights to code and designs are written into the contract.
  12. Post delivery support scope is defined.

Frequently asked questions

Is fixed price always cheaper?

No. Fixed price makes the budget predictable, but the team may add uncertainty to the price as a risk margin. Which costs less depends on how clear the scope is and how much changes.

How is the budget controlled under time and materials?

With a cap, regular spend reports and a priority review at the end of each cycle. When spend nears the cap, you decide together whether to continue.

What is a discovery phase, and is it necessary?

It is a short preliminary piece of work that clarifies requirements, screen flows and technical architecture. It makes the next proposal firmer when scope is unclear and may not be needed when scope is already clear.

Can you make changes in a fixed price project?

Yes, through a change request process. The effect on time and price is calculated in writing and the change enters the plan after your approval.

Which pricing model does Techmora use?

The model is agreed for each project after the brief is reviewed, and the budget is set by scope. You can send a brief describing your project through the contact form.